Top path tales

Pip started getting the top path sorted by digging in the wooden edging. It's a big job because the stone wall you see on to the left has a concrete base that extends and sticks up with rocks which would protrude in the new path. He's dug the stones in deeper now and got the first plank in. 

Next step is to clear the grass down the far end towards the compost bin and then dig in the final 2 planks. Then we'll lay the weed suppressant that was already in situ back down, butting up to the planks and put the original gravel back down for the path. 

A few steps then need to be added in the grass to join the 2 sets of steps that rise up to the new path. They'll probably be slate slabs, currently sat on top of the stone wall.

We love using up things that are already on site.