quick tidy up
Rainy days this week have turned attention back to inside working for Wojchiech, which I'm really pleased about as it will mean change will move fast now towards a usable room.
We've had a tidy and hoover up and turned the room into a no shoe zone because the floor was getting really messy and full of gravel from outside. Hopefully that's made the working space a bit clearer.
There's also progress in the bathroom, but no photos to show. The loo is in place and partially connected and the shower door frame is in.
The wall cabinets to go above the kitchen sink and fridge area have arrived and Pip has put them together. The fridge will go to left of the (blue protected) white gloss cupboard door.